Production log 7

What have you contributed this week?
I think that this week has gone well as we have finished our music video and we had finished it on schedule. All we had to do was add in some finishing touches to the music video and make sure that all the shots were in the right place and that it cuts to the beat. Afterwards when we were sure that the music video was finished to its highest standards, we uploaded it to YouTube. I am happy on how the music video turned out.

How does this fit in to your production schedule/job roles/overall ideas of the project?
We have stayed on schedule because we have finished the music video on time and we and we have added some effects such as fade in on the music video. I think the overall music video is good as we tried hard to finish it and we also had to face some problems during filming.

Were there any problems?
 There were no problems this week because we tried our best to get the music video finished, we have done that by staying back after school until we had done a good amount.

What are your plans for the following week?  
The plans for the following week are to complete past work that we have missed out and also to finish everything and to make sure that we are up to scratch.

Jobs roles and responsibilities

the role that i would take part in during the production of the music video will be the cameraman.

 i will have to make sure that:
  •  i get all the right shots
  •  there are no mistakes in the shots
  •  all the casts are in the right position
  •  i get more shots because it would help in editing
  •  keep the group focused
 i will be the most suitable to be the cameraman i know my way around the camera and also i can easily get a shot filmed. as the group and myself are working together, i can picture the shots and what is happening in each shot. we all have a clear idea of what we want out and what the storyline is and this is good as we will not have to waste time and explain what is happening in every shot. i would make a good role of making sure that all the shots are taken correctly, if there would be a problem during filming, i would be able to make a way around it so we all could stay on schedule. to get good shots in a low budget, i will have to be creative and work with what i have so i will make sure that i use everything we have as an advantage to make the shots better.













Sunday, 17 March 2013

Production log week 6

What have you contributed this week?
This week we have finished a draft of the music video that was done by Thursday and we got feedback from other groups and the teacher saying what was good about the music video and what could be improved/re-filmed. Luckily we do not have to re-film a lot but we might improve some areas of the music video if we have the time to.

 


 How does this fit in to your production schedule/job roles/overall ideas of the project?



We have finished a draft of the music idea by the deadline which means that we are on schedule but we have to make sure that next week is also good like this week.

Were there any problems?
Most of our cast are busy next week so there might be a problem when we have to film. However, we will make sure that we can make a day where everyone is free and can re-film the shots that didn’t turn out to be good. As we were looking at the music video, we also realised that not a lot of our shots was cut to the beat so we also have to make sure that we would fix that by next week.





What are your plans for the following week?
The plans for next week are to re-film the shots that are not good and that needs to be re-shot. We also have to make sure that all the editing is finished and that there are no mistakes, by doing this, we will stay after school until we have done a majority of editing each day so that we are sure to finish the music video by the deadline.